Typical scope
- Approved non-structural materials
- Damaged finishes and fixtures
- Protection for retained areas
- Debris handling within the agreed scope
Fire-damage demolition begins after structural, utility, insurance, and material hazards have been resolved by the responsible parties.

Selective removal of fire-damaged materials after the site is released for demolition work. The estimate should identify what comes out, what stays, and where the removed material travels.


Tell the estimator about gates, steps, occupied areas, soft ground, parking limits, and the distance from the work zone to the loading point. Those details shape labor, protection, and equipment choices.
Remove personal items from the work zone, identify anything that must stay, and gather measurements or photos that show all sides.
Point out electrical, plumbing, gas, irrigation, and drainage. Stop if material may contain asbestos, lead, mold, fuel, chemicals, or another regulated hazard.
The agreed debris is loaded and the immediate work area is swept. Grading, repair, patching, or rebuilding is included only when written into the scope.
Use the companion guide to collect the information that makes a fire damage demolition estimate more useful.
A phone conversation can establish fit and identify what still needs an on-site look.
Confirm which structure, contents, attached features, posts, footings, slab, and loose debris are included. Anything outside the written scope should be discussed before work starts.
Photos can help establish the likely scope. Access, hidden connections, material condition, and utility questions may still require an on-site assessment.
Mark nearby finishes, plants, equipment, utilities, and items to keep. The work plan should name the protection boundary before dismantling begins.
Call with the structure type, measurements, access notes, photos, and preferred timing.